Blog

Amarillo Avenue Residence - framing the second floor

Dec 10, 2018 by Hiromi Ogawa

At last week's site meeting for the Amarillo Avenue Residence, it was great to see that the top of the nearby persimmon tree will be framed by the clerestory windows in the master bathroom. The framing stage of construction is always very exciting, because what we've been designing and drawing for so many months finally starts to be real spaces in which we can stand, observe, and study. The site has come a long way since the slab foundation was poured a few months ago.